Preventative Maintenance:
In an effort to extend the life of university equipment and buildings, maintenance personnel are assigned the responsibility to complete Preventative Maintenance (PM) task.
The Work Control Center coordinates these activities and generates P.M. work orders that assist in completing regularly scheduled maintenance.
The Physical Plant staff has created (PM) work orders that ensure regularly scheduled maintenance is conducted on a regular basis.
These task include:
1. A quarterly check/replacement of air filters in all
buildings.
2. Roof inspections are conducted bi-annually to
inspect roof drains, surface conditions, water
ponding, and other potential problems which could
damage buildings and create water leaks.
3. (PM) Work Orders are are also generated to inspect
and perform routine test to monitor chiller
conditions to ensure maximum efficiency and life.
4. Monthly inspection are conducted monthly to inspect
Fire Alarm systems, Fire Extinguishers, Smoke
Detectors, Exit Sigs, and Emergency Signs for
safety inspections.
NOTE: The (PM) program consist of over 100 routine
building and equipment inspections to reach peak
performance and maximum life.
|